September 2020 may be the busiest month yet for the construction of the new ministry center!
A basic punch list for September includes:
- Finishing tiling and grouting on the first floor (almost done)
- Installing laminate flooring for the gym on the second floor (flooring purchased and awaiting installation)
- Getting electrical service to the building (request made)
- Wiring the building for electricity (in process)
- Installing pump and water deposit from the well and hooking up to city water. (awaiting permit)
- Installing plumbing fixtures (ready to go when water service is connected)
- Installing new elevator (being shipped from Italy)
- Insulating and creating final facade (in process)
- Sidewalks (after scaffolding is removed from the facade process)
In addition to the construction, we hope to move VT Albania into the building by the first of October and begin using the sanctuary then as well!
There don’t seem to be enough days in the month to get all of this done, but God does impossible math!